Roadmap
What is done, what is in live validation and what comes next. There are no release dates.
Aeron Copilot
Built in phases, from the cockpit on the ground to the gate.
Foundations and A32NX preparation
Done
From cold and dark to lined up on the runway
Validated live.
Done
Normal flight, from take-off to top of descent
Validated live, with a full flight to FL380.
Done
Descent, approach, landing and arrival at the gate
Implemented and in live validation.
In live validation
Abnormals and emergencies
ECAM procedures, engine failure, rejected take-off, windshear, overweight landing and declaring to ATC.
Next
Later
The FlyByWire A380X, the iniBuilds A350 and a teaching mode.
Planned
Aeron ATC
A separate track for the controller. The first version is a US domestic flight.
- The controller engine and the stripsDone
- Delivery, ground, tower, departure and centreDone
- FAA phraseologyDone
- The navigation data layerDone
- Arrival and terminal controlStill ahead
- NegotiationStill ahead
- The voice pipelineStill ahead
- Ghost trafficStill ahead
- The reference flightStill ahead
Contact.
Questions about Vemryx Aviation? Write to us by email or WhatsApp.